Services

Our platform offers a range of services

  • Data acquisition and 3D scanning, import, data processing, point cloud statements and photogrammetry,
  • Scientific exploitation of the data and images produced, scientific exploitation of the application of the 3D image to the heritage,
  • Theoretical research in the fields of activity,
  • Production of analytical architectural representations on the basis of acquisitions,
  • Development of specific it tools,
  • E-valorization of images and 3D environments,
  • Consultancy in the fields of activity.

The duration of the various tasks inherent, their cost and the personnel necessary for their realization depend on the mission to be considered and the characteristics of the objects or sites to be scanned, as well as those of the deliverables requested (dimensions, complexities necessary geometries, resolutions, completion of models,…). The evaluation of each of the contracts will be done by the Management Committee and the proposed pricing policy depends on the type of user.

How PANORAMA works

  1. PANORAMA is represented by a Manager, namely an academic designated for one year by each laboratory, in rotation.
  2. The decision-making body of PANORAMA is the Management Committee (CG)
    1. The CG is composed of six academics (two for each laboratory), researchers within the ULB concerned by the projects mentioned in the meeting, by the research logistician and the outside concerned, by invitation.
    2. In the event of a vote, the principle is "one person a voice". The vote by laboratory is nevertheless reduced to 1/3 of the ballot. The outside guests have an advisory voice.
  3. PANORAMA has a unique operating account whose signature is reserved for the Manager, with delegation for an academic of the other two laboratories. For "projects" accounts, the signature is entrusted to the Manager.
  4. The material is purchased on the basis of an egalitarian but proportional bottom-up by each laboratory. The equipment purchased by each laboratory remains its property, but is shared within the platform.

Cost estimation

Each estimate will pass through a standard form of third party service submitted to the TTO: http://www.ulb.ac.be/dr/prestationspourtiers.html

 Academic collaboration

Projects involving the PANORAMA platform are called collaborative as long as:

  • The project does not imply, over the duration, the use of the research logistician beyond 1/10 times,
  • The project leads to the publication of at least one scientific article in co-signature, incorporating the scientists of the platform that have been concretely associated with it,
  • The data is shared in intellectual co-ownership.
Protocol

Provision of the framework (academic, scientific and PATGS), on the basis of a written project and a specification, by decision of the Management Committee (CG) of PANORAMA on the basis of the prior agreement of the laboratories of the platform.

Loads
  • External commitments on the basis of a quotation (TTO),
  • Equipment insurance and consumables,
  • In case of academic collaboration outside the ULB, on the basis of a billing, 15% overheads and 21% VAT.
margin

0

  Projects involving the PANORAMA platform are called "service" if they do not meet at least one of the criteria of the collaborative mode of operation.

Academic background

Protocol

Provision of the framework (academic, scientific and PATGS), on the basis of a written project and a specification, by decision of the Management Committee of PANORAMA on the basis of the prior agreement of the laboratories of the platform

Loads
  • External commitments on the basis of a quotation (TTO),
  • Insurance for personnel, equipment and consumables.
margin

3% (material depreciation rate) based on a GC decision, the margin may be 0 if at least one of the following conditions is met:

  • Staff engagement,
  • Scientific interest of the project,
  • Realization of a publication.

   

 Procurement

Protocol

Response on the basis of a GC decision; folder mounted by the logistician under the supervision of the academic

Loads
  • External commitments on the basis of a quotation (TTO),
  • The purchase of the necessary equipment,
  • Insurance for personnel, equipment and consumables.
Costs
  • VAT 21%
  • Overhead ULB 15%
margin
  • 5 percent (depreciation rate of equipment),

Based on a GC decision, the margin may be 0 if at least one of the following conditions is met:

  • Staff engagement,
  • Scientific interest of the project,
  • Realization of a publication.

Subcontracting and consultancy

Protocol

Sending a quotation on the basis of a decision of the CG on the basis of a written request for service. Subcontracting and consultancy always implies the right to use the data by PANORAMA.

Loads

The total actual costs of the personnel involved (TTO): estimation of costs at 01/12/17

  • Academic: 1035 euros/day HTVA,
  • Post-doc researcher (-10 years seniority): 515.5 euros/day EXCL. VAT,
  • Post-doc researcher (+ 10 years): 632.5 euros/day HTVA,
  • Researcher or employee level master (-10 years): 460 euros/day EXCL. VAT,
  • Researcher or employee level master (+ 10 years): 575 euros/day EXCL. VAT),
  • Employee level BA or technician (-10 years): 287, 5 euros/day HTVA,
  • Employee level BA or technician (+ 10 years): 345 Euros/day EXCL. VAT,
  • Purchase/rental of equipment,
  • Travel package (75 euros/trip),
  • Insurance for personnel, equipment and consumables.
Costs
  • VAT 21%,
  • Overhead ULB 15%.
margin